ADIWASITO, JUDONO (2002) TUGAS AKHIR PERENCANAAN STRUKTUR DAM LEPAS PANTAI GUNA PENANGGULANGAN ROB DI KOTA SEMARANG. Other thesis, Prodi Teknik Sipil Unika Soegijapranata.
|
Text (COVER)
93.12.1123 Judono Adiwasito COVER.pdf Download (169kB) | Preview |
|
Text (BAB I)
93.12.1123 Judono Adiwasito BAB I.pdf Restricted to Registered users only Download (95kB) |
||
Text (BAB II)
93.12.1123 Judono Adiwasito BAB II.pdf Restricted to Registered users only Download (179kB) |
||
Text (BAB III)
93.12.1123 Judono Adiwasito BAB III.pdf Restricted to Registered users only Download (494kB) |
||
Text (BAB IV)
93.12.1123 Judono Adiwasito BAB IV.pdf Restricted to Registered users only Download (63kB) |
||
|
Text (DAFTAR PUSTAKA)
93.12.1123 Judono Adiwasito DAFTAR PUSTAKA.pdf Download (40kB) | Preview |
|
|
Text (LAMPIRAN)
93.12.1123 Judono Adiwasito LAMPIRAN.pdf Download (407kB) | Preview |
Abstract
Untuk penanggulangan tuntas masalah rob di kota Semarang, dalam tugas akhir ini direncanakan struktur dam lepas pantai panjang 18.000 m, lebar 80 m dan tinggi 40 m dengan umur pakai 50 tahun. tujuan perencanaan dam ini untuk memanfaatkan air tawar yang ada semaksimal mungkin bagi kelestarian lingkungan dan keperluan umat manusia dengan mencegah air tawar yang ada berubah menjadi air laut. perencanaan struktur dam lepas pantai ini ditinjau dari struktur tubuh damnya saja dengan sistem JWL (John Wirawan Linda). sistem JWL ini tidak memerlukan pondasi karena berat sendiri tubuh dam tersebut sudah stabil terhadap geser, guling dan daya dukung tanah.
Item Type: | Thesis (Other) |
---|---|
Subjects: | 600 Technology (Applied sciences) > 620 Engineering > 624 Civil engineering |
Divisions: | Faculty of Engineering > Department of Civil Engineering |
Depositing User: | Mr Andika Margahadi |
Date Deposited: | 26 Oct 2016 04:22 |
Last Modified: | 26 Oct 2016 04:22 |
URI: | http://repository.unika.ac.id/id/eprint/12324 |
Actions (login required)
View Item |