ANALISIS RISIKO TERJADINYA COST OVERRUN PADA PROYEK KONSTRUKSI (Studi Kasus: Proyek Konstruksi X di Jawa Barat)

KUSUMA, ARGA PRENATA (2025) ANALISIS RISIKO TERJADINYA COST OVERRUN PADA PROYEK KONSTRUKSI (Studi Kasus: Proyek Konstruksi X di Jawa Barat). S1 thesis, UNIVERSITAS KATOLIK SOEGIJAPRANATA.

[img]
Preview
Text
19.B1.0001_ARGA PRENATA KUSUMA_COVER.pdf

Download (441kB) | Preview
[img] Text
19.B1.0001_ARGA PRENATA KUSUMA_BAB I.pdf
Restricted to Registered users only

Download (551kB)
[img] Text
19.B1.0001_ARGA PRENATA KUSUMA_BAB II.pdf
Restricted to Registered users only

Download (699kB)
[img] Text
19.B1.0001_ARGA PRENATA KUSUMA_BAB III.pdf
Restricted to Registered users only

Download (681kB)
[img] Text
19.B1.0001_ARGA PRENATA KUSUMA_BAB IV.pdf
Restricted to Registered users only

Download (847kB)
[img] Text
19.B1.0001_ARGA PRENATA KUSUMA_BAB V.pdf
Restricted to Registered users only

Download (1MB)
[img] Text
19.B1.0001_ARGA PRENATA KUSUMA_BAB VI.pdf
Restricted to Registered users only

Download (517kB)
[img]
Preview
Text
19.B1.0001_ARGA PRENATA KUSUMA_DAPUS.pdf

Download (539kB) | Preview
[img] Text
19.B1.0001_ARGA PRENATA KUSUMA_LAMP.pdf
Restricted to Registered users only

Download (3MB)

Abstract

In its implementation, a construction project is always exposed to various risks. The inability to manage risks in a project can lead to multiple problems, one of which is cost overrun. Cost overrun refers to a situation where the actual cost of a project exceeds the initial estimated cost. The occurrence of cost overrun is caused by various types of risks and uncertainties in the project. Therefore, proper risk management efforts are necessary to control project costs and reduce the likelihood of cost overruns. Risk management includes risk identification, risk classification, risk analysis, and risk response. This study aims to identify risk factors and mitigation efforts for the risks causing cost overruns in construction projects, specifically in project X in West Java. The analytical method used in this study is the probability and impact matrix. The results identify 39 risk factors contributing to cost overruns in construction projects in West Java, with three dominant risk factors: low labor productivity, contracts awarded to the lowest bidder, and additional work.

Item Type: Thesis (S1)
Subjects: 600 Technology (Applied sciences) > 620 Engineering > 624 Civil engineering
Divisions: Faculty of Engineering > Department of Civil Engineering
Depositing User: ms. Wiwien Vieragustin
Date Deposited: 11 Jul 2025 02:50
Last Modified: 11 Jul 2025 02:50
URI: http://repository.unika.ac.id/id/eprint/37984
Keywords: UNSPECIFIED