Up a level |
SETIJOWARNO, DJOKO (2011) SISTEM SATU ARAH JALAN INDRAPRASTA. Sistem Satu Arah.
Herlambang, Denis Bramedio (2016) PROYEK PEMBANGUNAN JALAN TOL SEMARANG – SOLO TAHAP II RUAS BAWEN – SOLO, JEMBATAN TUNTANG PAKET 3.1 : BAWEN – POLOSIRI. Project Report. Fakultas Teknik, Unika Soegijapranata, Semarang. (Unpublished)
Putri, Alfiana (2016) "PROYEK PEMBANGUNAN JALAN TOL SEMARANG - SOLO TAHAP II RUAS BAWEN – SOLO, JEMBATAN TUNTANG PAKET 3.1 : BAWEN - POLOSIRI". Project Report. Fakultas Teknik, Unika Soegijapranata Semarang, Semarang. (Unpublished)
Setyadi, Rosie Febri (2016) "LAPORAN PRAKTIK KERJA PROYEK PEMBANGUNAN JALAN TOL SEMARANG – SOLO TAHAP II RUAS BAWEN – SOLO, JEMBATAN TUNTANG PAKET 3.1 : BAWEN – POLOSIRI". Project Report. Fakultas Teknik, Unika Soegijapranata Semarang, Semarang. (Unpublished)
Ruktiningsih, Rudatin (2005) CBR VALUE OF ILITE CLAY IMPROVEMENT WITH LIME AND PORTLAND CEMENT. In: International Seminar and Exhibition on Road Constructons, May 26, 2005, Semarang. (Unpublished)
Bara, Natalia and Sunarti, Martina (2000) PENINGKATAN JALAN BOJA - KALIWUNGU. Other thesis, Fakultas Teknik.
HARTONO, AGUS DWI and UTOMO, ENDRO (1997) PERENCANAAN OUTER RING ROAD JALAN PRAMUKA-MIJEN KODIA SEMARANG. Other thesis, Prodi Sipil Unika Soegijapranata.
HERMAWAN, DODY (2013) KAJIAN PELAYANAN KERETA API RUTE SEMARANG - JAKARTA (STUDI KASUS : KERETA API MENOREH). Other thesis, Prodi Teknik Sipil Unika Soegijapranata.
Krisna, Suryo Hadi Indra (2016) STABILISASI TANAH ORGANIK DENGAN PENAMBAHAN FLY ASH (STUDI KASUS : JALAN STADION, KOTA KENDAL). Other thesis, Unika Soegijapranata Semarang.
Palma, Edward Dion and Bustani, Petra Aprilian (2016) ANALISIS SISTEM PENGANGKUTAN SAMPAH DARI TEMPAT PENAMPUNGAN SEMENTARA KE TEMPAT PEMROSESAN AKHIR DI KOTA SEMARANG (STUDI KASUS: KECAMATAN SEMARANG BARAT, PEDURUNGAN, DAN BANYUMANIK). Other thesis, Fakultas Teknik UNIKA Soegijapranata Semarang.
Pontonugroho, - (2013) TUGAS AKHIR KAJIAN PELAYANAN KERETA API RUTE SEMARANG-JAKARTA ( STUDI KASUS : KERETA API MENOREH ). Other thesis, Prodi Teknik Sipil Unika Soegijapranata.
RUDYANTO, . and INDROYONO, . (2001) PERENCANAAN JALAN GUNUNG PATI - MANYARAN KODYA SEMARANG. Other thesis, Prodi Sipil Unika Soegijapranata.
Setiawan, Ign. Danny and Sulistyo K, Dyah (2002) ALTERNATIF PENGGUNAAN JALAN REL UNTUK ANGKUTAN PASIR (STUDI KASUS MUNTILAN - SEMARANG). Other thesis, Fakultas Teknik.
Sulistyo K, Dyah and Setiawan, Ign. Danny (2002) ALTERNATIF PENGGUNAAN JALAN REL UNTUK ANGKUTAN PASIR (STUDI KASUS MUNTILAN - SEMARANG). Other thesis, Fakultas Teknik.
Sunarti, Martina and Bara, Natalia (2000) PENINGKATAN JALAN BOJA - KALIWUNGU. Other thesis, Fakultas Teknik.
TEJO, MARTIN INDRAWAN PUTRANTO (2014) PERANCANGAN DAN PENGUJIAN MOTOR LINIER SWITCH RELUCTANCE 3 ROTOR 8 STATOR BERBASIS MIKROKONTROLER PIC 18F4550. Other thesis, Unika Soegijapranata Semarang.
WIDOYOKO, ARTONO and MARLINA, DYAN (2001) HUBUNGAN ANTARA KEBISINGAN DAN ARUS LALU LINTAS (STUDI KASUS: JALAN PERINTIS KEMERDEKAAN-SETIA BUDI SEMARANG). Other thesis, Fakultas Teknik Universitas Katolik Soegijapranata.
Arnanda, Dony Asprilla and Putra, Evan Urianda and Mulyanto, Yohanes Yuli and SUSENO, WIDIJA Turnitin_PENGARUH KADAR ACCCELERATING ADMIXTURE TERHADAP KUAT TEKAN BETON UNTUK PERKERASAN JALAN DENGAN KOSTRUKSI PERKERASAN KAKU. UNIVERSITAS KATOLIK SOEGIJAPRANATA. (Unpublished)
susilorini, Rr. M. I. Retno Penilaian Reviewer 01 Artikel 05. UNSPECIFIED.
susilorini, Rr. M. I. Retno Penilaian Reviewer 01 Artikel 06. UNSPECIFIED.
susilorini, Rr. M. I. Retno TTD Penilaian Reviewer 01 Artikel 08. UNSPECIFIED.