KAJIAN ANGKUTAN SEDIMEN SUNGAI SENGKARANG KABUPATEN PEKALONGAN

Wijanarko, Aji (2019) KAJIAN ANGKUTAN SEDIMEN SUNGAI SENGKARANG KABUPATEN PEKALONGAN. Other thesis, UNIKA SOEGIJAPRANATA SEMARANG.

[img]
Preview
Text (COVER)
14.B1.0044 AJI WIJANARKO (7.95)..pdf COVER.pdf

Download (1MB) | Preview
[img]
Preview
Text (BAB I)
14.B1.0044 AJI WIJANARKO (7.95)..pdf BAB I.pdf

Download (157kB) | Preview
[img] Text (BAB II)
14.B1.0044 AJI WIJANARKO (7.95)..pdf BAB II.pdf
Restricted to Registered users only

Download (1MB)
[img]
Preview
Text (BAB III)
14.B1.0044 AJI WIJANARKO (7.95)..pdf BAB III.pdf

Download (1MB) | Preview
[img]
Preview
Text (BAB IV)
14.B1.0044 AJI WIJANARKO (7.95)..pdf BAB IV.pdf

Download (1MB) | Preview
[img]
Preview
Text (BAB V)
14.B1.0044 AJI WIJANARKO (7.95)..pdf BAB V.pdf

Download (141kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
14.B1.0044 AJI WIJANARKO (7.95)..pdf DAPUS.pdf

Download (341kB) | Preview
[img]
Preview
Text (LAMPIRAN)
14.B1.0044 AJI WIJANARKO (7.95)..pdf LAMP.pdf

Download (2MB) | Preview

Abstract

One of the rivers which is the source of raw water in Pekalongan Regency is Sungai Sengkarang. This river has a large cross-sectional capacity. Rivers that have large cross-sectional capacity usually occur in the sediment transport process. Sedimentation is one of the problems of rivers in Indonesia which causes siltation and capacity of the river, so that it can cause flooding around the river flow. This problem can be assessed by calculating sediment transport in the Sengkarang River. Research calculations using the Yang, Engelund-Hansen, and Shen and Hung Methods. The highest sediment load is on September 1, 2017 at 01.00 WIB which is 1.642 tons / hour with flowrate of 56.2 m3 / s (Shen and Hung Method) with flowrate of 56.2 m3/s. Suggestions from researchers for further research is to add or change methods and do dredging of sediments to make the results more accurate. The results of this study indicate that the total potential volume of sediment by calculating the Yang method on the Sengkarang River for 4 days ranged from 9 tons to 10 tons. The total potential volume of sediments with the calculation of the Shen and Hung Method on the Sengkarang River for 4 days amounted to 47 tons to 48 tons and the potential total volume of sediment calculated by Engelund and Hansen on the Sengkarang River for 4 days was 8 tons to 9 tons. Key Words : sedimentation, sediment transport, sediment volume

Item Type: Thesis (Other)
Subjects: 300 Social Sciences > 380 Commerce, communications & transportation > 387 Water, air & space transportation
Divisions: Faculty of Engineering > Department of Civil Engineering
Depositing User: Mr Lucius Oentoeng
Date Deposited: 02 Jul 2019 08:34
Last Modified: 20 Nov 2020 00:57
URI: http://repository.unika.ac.id/id/eprint/19353

Actions (login required)

View Item View Item