DWI B, A. CHRISTOPHER and WASONO, DANIEL SURYO and Hermawan, Hermawan and Hatmoko, Jati Utomo Dwi Turnitin_K15_STUDI AWAL EFISIENSI PENGGUNAAN 5D-BIM TERHADAP VOLUME MATERIAL DAN ESTIMASI BIAYA PADA PROYEK KONSTRUKSI (STUDI KASUS RUMAH TINGGAL 2 LANTAI). Unika Soegijapranata. (Unpublished)
Text
Turnitin_K15-MK 08-Studi Awal Efisiensi Penggunaan 5D-BIM Terhadap Volume Material dan Estimasi Biaya Pada Pr.pdf - Other Restricted to Repository staff only Download (1MB) |
Item Type: | Other |
---|---|
Subjects: | 600 Technology (Applied sciences) 600 Technology (Applied sciences) > 620 Engineering > 624 Civil engineering > Civil Engineering |
Depositing User: | Mr Hermawan - |
Date Deposited: | 23 Nov 2022 07:26 |
Last Modified: | 23 Nov 2022 07:26 |
URI: | http://repository.unika.ac.id/id/eprint/30219 |
Actions (login required)
View Item |