Prosiding K15_STUDI AWAL EFISIENSI PENGGUNAAN 5D-BIM TERHADAP VOLUME MATERIAL DAN ESTIMASI BIAYA PADA PROYEK KONSTRUKSI (STUDI KASUS RUMAH TINGGAL 2 LANTAI)

DWI B, A. CHRISTOPHER and WASONO, DANIEL SURYO and Hermawan, Hermawan and Hatmoko, Jati Utomo Dwi Prosiding K15_STUDI AWAL EFISIENSI PENGGUNAAN 5D-BIM TERHADAP VOLUME MATERIAL DAN ESTIMASI BIAYA PADA PROYEK KONSTRUKSI (STUDI KASUS RUMAH TINGGAL 2 LANTAI). In: Konteks 15, 21-22 Oktober 2021, Universitas Katolik Soegijapranata, Semarang.

[img]
Preview
Text
MK-08.pdf - Published Version

Download (6MB) | Preview
Item Type: Conference or Workshop Item (Paper)
Subjects: 600 Technology (Applied sciences) > 620 Engineering > 624 Civil engineering > Civil Engineering
Depositing User: Mr Hermawan -
Date Deposited: 22 Nov 2022 06:05
Last Modified: 22 Nov 2022 15:30
URI: http://repository.unika.ac.id/id/eprint/30182

Actions (login required)

View Item View Item