Neilkevin, Jovana (2021) PENGARUH REVERSE CONSTRUCTION SUPPLY CHAIN PADA GREEN BUILDING (Studi Kasus Pada Proyek Pembangunan Pasar Umum Gianyar). Project Report. Fakultas Teknik, Unika Soegijapranata, Semarang. (Unpublished)
Text
17B10006_Neilkelvin_Tugas Akhir.pdf Restricted to Registered users only until 2021. Download (10MB) |
Abstract
Tidak Ada
Item Type: | Monograph (Project Report) |
---|---|
Subjects: | 600 Technology (Applied sciences) > 620 Engineering > 627 Hydraulic engineering |
Divisions: | Faculty of Engineering > Department of Civil Engineering - Project Report |
Depositing User: | Mr Agung Tri Hartadi |
Date Deposited: | 23 Sep 2021 03:39 |
Last Modified: | 23 Sep 2021 03:39 |
URI: | http://repository.unika.ac.id/id/eprint/26546 |
Actions (login required)
View Item |