IDENTIFIKASI DAN REDUKSI WASTE PADA PROSES PRODUKSI PERLENGKAPAN BAYI MENGGUNAKAN METODE VALSAT DENGAN 5W + 1H STUDI KASUS PADA MONICA COLLECTION

PRASETYO, CHRISTOPORUS BAGAS (2019) IDENTIFIKASI DAN REDUKSI WASTE PADA PROSES PRODUKSI PERLENGKAPAN BAYI MENGGUNAKAN METODE VALSAT DENGAN 5W + 1H STUDI KASUS PADA MONICA COLLECTION. Other thesis, UNIKA SOEGIJAPRANATA SEMARANG.

[img]
Preview
Text (COVER)
15.D1.0083 CHRISTOPORUS BAGAS PRASETYO (6.52)..pdf COVER.pdf

Download (1MB) | Preview
[img]
Preview
Text (BAB I)
15.D1.0083 CHRISTOPORUS BAGAS PRASETYO (6.52)..pdf BAB I.pdf

Download (430kB) | Preview
[img] Text (BAB II)
15.D1.0083 CHRISTOPORUS BAGAS PRASETYO (6.52)..pdf BAB II.pdf
Restricted to Registered users only

Download (486kB)
[img]
Preview
Text (BAB III)
15.D1.0083 CHRISTOPORUS BAGAS PRASETYO (6.52)..pdf BAB III.pdf

Download (171kB) | Preview
[img]
Preview
Text (BAB IV)
15.D1.0083 CHRISTOPORUS BAGAS PRASETYO (6.52)..pdf BAB IV.pdf

Download (892kB) | Preview
[img]
Preview
Text (BAB V)
15.D1.0083 CHRISTOPORUS BAGAS PRASETYO (6.52)..pdf BAB V.pdf

Download (36kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
15.D1.0083 CHRISTOPORUS BAGAS PRASETYO (6.52)..pdf DAPUS.pdf

Download (113kB) | Preview
[img]
Preview
Text (LAMPIRAN)
15.D1.0083 CHRISTOPORUS BAGAS PRASETYO (6.52)..pdf LAMP.pdf

Download (495kB) | Preview

Abstract

Waste is an activity that does not provide added value in a production process so it must be reduced or eliminated. Monica Collection is a company engaged in the manufacture of baby equipment. In the production process Monica Collection still identifies several waste. Therefore this study aims to identify the waste that occurs and provide waste minimization design to be able to increase the effectiveness and efficiency of the company's production process. VALSAT is a tool used to identify waste that appears. In this study using 3 identification tools including supply chain response matrix, quality filter mapping, and PAM. Then the identification results are analyzed using a fish bone diagram to find the root of the emergence of waste. From the results of identification of waste carried out, 4 wastes were identified, namely inventory, transportation, waiting time, and defect. The design suggestion for minimizing the 4 waste among them to waste inventory is making an EOQ method on ordering raw materials. For waste waiting time the advice given is to implement a line balancing system in the production process. While it is a waste waiting time, the advice given is to rearrange the layout of production and for waste defects the advice given is addition on controlling activities in the production process.

Item Type: Thesis (Other)
Subjects: 600 Technology (Applied sciences) > 650 Management > 658 Management > Production Management
Divisions: Faculty of Economics and Business > Department of Management
Depositing User: Mr Lucius Oentoeng
Date Deposited: 22 Nov 2019 01:38
Last Modified: 02 Nov 2020 03:46
URI: http://repository.unika.ac.id/id/eprint/20151

Actions (login required)

View Item View Item