Search for collections on Unika Repository

ANALISIS KEBUTUHAN FASILITAS PENYEBERANGAN ORANG (STUDI KASUS : JALAN PANDANARAN, JALAN MT HARYONO, JALAN TEUKU UMAR, SEMARANG)

Prasetya, Rizky Alfiandhi (2019) ANALISIS KEBUTUHAN FASILITAS PENYEBERANGAN ORANG (STUDI KASUS : JALAN PANDANARAN, JALAN MT HARYONO, JALAN TEUKU UMAR, SEMARANG). Other thesis, UNIKA SOEGIJAPRANATA SEMARANG.

[img]
Preview
Text (COVER)
14.B1.0098 RIZKY ALFIANDHI PRASETYA (2.66)..pdf COVER.pdf

Download (704kB) | Preview
[img]
Preview
Text (BAB I)
14.B1.0098 RIZKY ALFIANDHI PRASETYA (2.66)..pdf BAB I.pdf

Download (371kB) | Preview
[img] Text (BAB II)
14.B1.0098 RIZKY ALFIANDHI PRASETYA (2.66)..pdf BAB II.pdf
Restricted to Registered users only

Download (850kB)
[img]
Preview
Text (BAB III)
14.B1.0098 RIZKY ALFIANDHI PRASETYA (2.66)..pdf BAB III.pdf

Download (1MB) | Preview
[img]
Preview
Text (BAB IV)
14.B1.0098 RIZKY ALFIANDHI PRASETYA (2.66)..pdf BAB IV.pdf

Download (3MB) | Preview
[img]
Preview
Text (BAB V)
14.B1.0098 RIZKY ALFIANDHI PRASETYA (2.66)..pdf BAB V.pdf

Download (372kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
14.B1.0098 RIZKY ALFIANDHI PRASETYA (2.66)..pdf DAPUS.pdf

Download (469kB) | Preview
[img]
Preview
Text (LAMPIRAN)
14.B1.0098 RIZKY ALFIANDHI PRASETYA (2.66)..pdf LAMP.pdf

Download (1MB) | Preview

Abstract

Along with the progress and development of the population in the City, large volumes of vehicles and pedestrians are increasing. This will result in a conflict between the volume of vehicles passing and pedestrians crossing. The problem that occurs is the conflict between road crossers and motorized vehicles that allows accidents to occur. To avoid accidents, crossing facilities are needed. This study aims to analyze the need for pedestrian crossing facilities and provide recommendations on the type of crossing facilities for the right person. Data collection is done by direct survey at a predetermined location point observed for three days during rush hour. The data taken is in the form of vehicle volume, pedestrian volume, and road geometry. The data obtained is used to get the PV2 value. This value will be used to determine the type of crossing facility for the person that matches the specified location point. The results of PV2 calculations for the four location points observed obtained three feasible locations for the planned construction of crossing facilities, namely on the Pandanaran road section at the location point of AGUSTA equipment store in the form of pelican crossing (lamp swakelola) with a PV2 value of 139,332,136.5. The MT Haryono road at the Java Mall location is in the form of pelican crossing (swakelola lamp) with a waiting stall which has a value of PV2 223,388,673.3. The Teuku Umar road section at the Jatingaleh Market location is in the form of a non-plot crossing with a value of PV2 1,087,398,217. One location does not require crossing facilities for people, that is, on the Teuku Umar road in front of the Antonius Vocational School, no crossing facilities are needed. Keywords: Vehicle Volume, Crossing Volume, Crossing Facilities, Pelican Crossing

Item Type: Thesis (Other)
Subjects: 600 Technology (Applied sciences) > 620 Engineering > 624 Civil engineering > Applied Engineering > Bridge
Divisions: Faculty of Engineering > Department of Civil Engineering
Depositing User: Mr Lucius Oentoeng
Date Deposited: 02 Jul 2019 08:33
Last Modified: 02 Jul 2019 08:33
URI: http://repository.unika.ac.id/id/eprint/19365

Actions (login required)

View Item View Item