Pratama, Fendy and Christian S., Andreas (2019) EVALUASI ANGKUTAN UMUM DITINJAU DARI BIAYA OPERASIONAL KENDARAAN (BOK) DI KOTA SEMARANG (STUDI KASUS ANGKUTAN UMUM C4 DAN C10). Other thesis, UNIKA SOEGIJAPRANATA SEMARANG.
|
Text (COVER)
14.B1.0009 FENDY PRATAMA (5.06)..pdf COVER.pdf Download (756kB) | Preview |
|
|
Text (BAB I)
14.B1.0009 FENDY PRATAMA (5.06)..pdf BAB I.pdf Download (337kB) | Preview |
|
Text (BAB II)
14.B1.0009 FENDY PRATAMA (5.06)..pdf BAB II.pdf Restricted to Registered users only Download (422kB) |
||
|
Text (BAB III)
14.B1.0009 FENDY PRATAMA (5.06)..pdf BAB III.pdf Download (221kB) | Preview |
|
|
Text (BAB IV)
14.B1.0009 FENDY PRATAMA (5.06)..pdf BAB IV.pdf Download (1MB) | Preview |
|
|
Text (BAB V)
14.B1.0009 FENDY PRATAMA (5.06)..pdf BAB V.pdf Download (217kB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
14.B1.0009 FENDY PRATAMA (5.06)..pdf DAPUS.pdf Download (109kB) | Preview |
|
|
Text (LAMPIRAN)
14.B1.0009 FENDY PRATAMA (5.06)..pdf LAMP.pdf Download (1MB) | Preview |
Abstract
The increasing population growth in the city of Semarang will certainly affect traffic congestion. At present many people have forgotten the role of public transport, which is increasingly decreasing the number of fleets. This research was conducted to evaluate public transport in terms of Vehicle Operating Costs (BOK) in order to provide input to the government to pay attention to the current conditions of public transport. The method used is a direct survey to the field to obtain secondary data which will later be processed using the BOK formula. Vehicle Operational Cost is a cost calculated using a formula to determine how much the cost of a vehicle is spent. The research was carried out only for the Semarang public transport route C4, majoring in Pasar Johar - Tlogosari and C10, at Pasar Johar - Banyumanik. This route was chosen due to the different routes being passed, for the C4 public transport route to only pass through the lowland route, and for the C10 public transport route to pass through the highland route, so that this study was conducted to determine the difference between Vehicle Operating Costs C4 and public transportation C10. Operational Costs This vehicle has two types of costs, namely direct costs and indirect costs. In this case, the calculation of the operational costs of vehicles of the type of mini bus public transportation is only a direct cost. The operational cost calculation of this vehicle aims to determine the tariff of public transportation on a particular route. Based on the research results of the calculation of the operational costs of public transport vehicles C4 and C10, they are around Rp. 1,000.00 - Rp. 1,600.00 per km. The results of the vehicle's operational costs can also change every year. This is due to changes in prices of the operational costs of the vehicle. Keywords: Congestion, Vehicle Operating Costs, Fuel costs
Item Type: | Thesis (Other) |
---|---|
Subjects: | 300 Social Sciences > 380 Commerce, communications & transportation |
Divisions: | Faculty of Engineering > Department of Civil Engineering |
Depositing User: | Mr Lucius Oentoeng |
Date Deposited: | 02 Jul 2019 08:34 |
Last Modified: | 02 Jul 2019 08:34 |
URI: | http://repository.unika.ac.id/id/eprint/19347 |
Actions (login required)
View Item |