HAPSARI, GALIH (2024) ANALISA DAMPAK COVID – 19 TERHADAP KATERLAMBATAN WAKTU PELAKSANAAN PROYEK PEMBANGUNAN FAKULTAS TEKNIK 3 UNIVERSITAS TIDAR. Project Report. Program Studi Teknik Sipil Unika Soegijapranata Semarang. (Unpublished)
|
Text
22.B5.0004-GALIH HAPSARI_COVER.pdf Download (2MB) | Preview |
|
|
Text
22.B5.0004-GALIH HAPSARI_BAB I-V.pdf Restricted to Registered users only Download (4MB) |
||
|
Text
22.B5.0004-GALIH HAPSARI_DAPUS.pdf Restricted to Registered users only Download (1MB) |
||
|
Text
22.B5.0004-GALIH HAPSARI_LAMP.pdf Restricted to Registered users only Download (1MB) |
Abstract
-
| Item Type: | Monograph (Project Report) |
|---|---|
| Subjects: | 600 Technology (Applied sciences) > 620 Engineering > 624 Civil engineering |
| Divisions: | Faculty of Engineering > Engineer Professional Program |
| Depositing User: | Ms Cristina Mayasari |
| Date Deposited: | 12 Aug 2024 05:29 |
| Last Modified: | 12 Aug 2024 05:29 |
| URI: | http://repository.unika.ac.id/id/eprint/36035 |
| Keywords: | UNSPECIFIED |
Actions (login required)
![]() |
View Item |
