DWI B, A. CHRISTOPHER and WASONO, DANIEL SURYO and Hermawan, Hermawan and Hatmoko, Jati Utomo Dwi Turnitin_K15_STUDI AWAL EFISIENSI PENGGUNAAN 5D-BIM TERHADAP VOLUME MATERIAL DAN ESTIMASI BIAYA PADA PROYEK KONSTRUKSI (STUDI KASUS RUMAH TINGGAL 2 LANTAI). Unika Soegijapranata. (Unpublished)
|
Text
Turnitin_K15-MK 08-Studi Awal Efisiensi Penggunaan 5D-BIM Terhadap Volume Material dan Estimasi Biaya Pada Pr.pdf - Other Restricted to Repository staff only Download (1MB) |
| Item Type: | Other |
|---|---|
| Subjects: | 600 Technology (Applied sciences) 600 Technology (Applied sciences) > 620 Engineering > 624 Civil engineering > Civil Engineering |
| Depositing User: | Mr Hermawan - |
| Date Deposited: | 23 Nov 2022 07:26 |
| Last Modified: | 23 Nov 2022 07:26 |
| URI: | http://repository.unika.ac.id/id/eprint/30219 |
| Keywords: | UNSPECIFIED |
Actions (login required)
![]() |
View Item |
