Turnitin_Comparative Study in Bill of Quantity Estimates on Reinforcement Works of Pile Cap, Single Pier adn Double Pier of Flyover Between Conventional Methods and BIM (Building Information Modelling)

Putra, Atanasius Agri Permadi and Wiharno, Oei, Natanael Indrawan and Hermawan, Hermawan and Hasiholan, Budi Turnitin_Comparative Study in Bill of Quantity Estimates on Reinforcement Works of Pile Cap, Single Pier adn Double Pier of Flyover Between Conventional Methods and BIM (Building Information Modelling). IOP Conference Series: Earth and Environmental Science (IOP EES).

[img] Text
Turnitin_Comparative Study in Bill of Quantity Estimates on Reinforcement Works of Pile Cap, Single Pier adn Double Pier of Flyover Between Conventional Methods and BIM (Building Information Modellin.pdf
Restricted to Repository staff only

Download (1MB)
Item Type: Other
Subjects: 600 Technology (Applied sciences)
600 Technology (Applied sciences) > 620 Engineering
Depositing User: Mr Hermawan -
Date Deposited: 27 Sep 2022 05:26
Last Modified: 27 Sep 2022 05:26
URI: http://repository.unika.ac.id/id/eprint/29310

Actions (login required)

View Item View Item