ARSYADANI, ROBBY (2019) ANALISIS DAN EVALUASI WASTE MATERIAL MENGGUNAKAN BIM (BUILDING INFORMATION MODELING) PADA PROYEK KONSTRUKSI (STUDI KASUS BANGUNAN TINGKAT TINGGI). Other thesis, UNIKA SOEGIJAPRANATA SEMARANG.
|
Text (COVER)
14.B1.0105 ROBBY ARSYADANI (5.29)..pdf COVER.pdf Download (5MB) | Preview |
|
|
Text (BAB I)
14.B1.0105 ROBBY ARSYADANI (5.29)..pdf BAB I.pdf Restricted to Registered users only Download (909kB) |
||
|
Text (BAB II)
14.B1.0105 ROBBY ARSYADANI (5.29)..pdf BAB II.pdf Restricted to Registered users only Download (858kB) |
||
|
Text (BAB III)
14.B1.0105 ROBBY ARSYADANI (5.29)..pdf BAB III.pdf Restricted to Registered users only Download (1MB) |
||
|
Text (BAB IV)
14.B1.0105 ROBBY ARSYADANI (5.29)..pdf BAB IV.pdf Restricted to Registered users only Download (872kB) |
||
|
Text (BAB V)
14.B1.0105 ROBBY ARSYADANI (5.29)..pdf BAB V.pdf Restricted to Registered users only Download (3MB) |
||
|
Text (BAB VI)
14.B1.0105 ROBBY ARSYADANI (5.29)..pdf BAB VI.pdf Restricted to Registered users only Download (614kB) |
||
|
Text (DAFTAR PUSTAKA)
14.B1.0105 ROBBY ARSYADANI (5.29)..pdf DAPUS.pdf Download (652kB) | Preview |
| Item Type: | Thesis (Other) |
|---|---|
| Subjects: | 600 Technology (Applied sciences) > 690 Building & construction > Construction Building |
| Divisions: | Faculty of Engineering > Department of Civil Engineering |
| Depositing User: | Mr Lucius Oentoeng |
| Date Deposited: | 28 Nov 2019 01:41 |
| Last Modified: | 25 Sep 2020 07:34 |
| URI: | http://repository.unika.ac.id/id/eprint/20509 |
| Keywords: | UNSPECIFIED |
Actions (login required)
![]() |
View Item |
