HARI P, HENDRAWAN and PERMADI, ONGKO (2002) EVALUASI PENYELESAIAN PELAKSANAAN PROYEK TERHADAP BIAYA, MUTU DAN WAKTU PADA PROYEK GEDUNG PERPUSTAKAAN PUSAT UNIKA SOEGIJAPRANATA. Other thesis, Fakultas Teknik Universitas Katolik Soegijapranata.
|
Text (COVER)
95.12.1455 Ongko Permadi COVER.pdf Restricted to Registered users only Download (266kB) |
||
|
Text (BAB I)
95.12.1455 Ongko Permadi BAB I.pdf Restricted to Registered users only Download (107kB) |
||
|
Text (BAB II)
95.12.1455 Ongko Permadi BAB II.pdf Restricted to Registered users only Download (258kB) |
||
|
Text (BAB III)
95.12.1455 Ongko Permadi BAB III.pdf Restricted to Registered users only Download (278kB) |
||
|
Text (BAB IV)
95.12.1455 Ongko Permadi BAB IV.pdf Restricted to Registered users only Download (107kB) |
||
|
Text (BAB V)
95.12.1455 Ongko Permadi BAB V.pdf Restricted to Registered users only Download (1MB) |
||
|
Text (BAB VI)
95.12.1455 Ongko Permadi BAB VI.pdf Restricted to Registered users only Download (80kB) |
||
|
Text (DAFTAR PUSTAKA)
95.12.1455 Ongko Permadi DAFTAR PUSTAKA.pdf Download (42kB) | Preview |
|
|
Text (LAMPIRAN)
95.12.1455 Ongko Permadi LAMPIRAN.pdf Restricted to Registered users only Download (2MB) |
Abstract
TIDAK ADA
| Item Type: | Thesis (Other) |
|---|---|
| Subjects: | 600 Technology (Applied sciences) > 690 Building & construction > Construction Building |
| Divisions: | Faculty of Engineering > Department of Civil Engineering |
| Depositing User: | Mr Lucius Oentoeng |
| Date Deposited: | 30 Mar 2017 05:46 |
| Last Modified: | 30 Mar 2017 05:46 |
| URI: | http://repository.unika.ac.id/id/eprint/13008 |
| Keywords: | UNSPECIFIED |
Actions (login required)
![]() |
View Item |
